Rear Spade Installation
Need Help?
(800) 222-6047
Other Diagrams for this model:
- Boom Installation - 2 Piece Boom
- Boom Installation - 3 Piece Boom
- Boom Tube Assembly
- Controls - 12 Function Non-Proportional Miratron
- Controls - 12 Function Proportional Miratron
- Controls - 6 Function Non-Proportional Miratron
- Controls - Control Valve Assembly
- Controls - Control Valve Installation
- Controls - Electrical Emergency Stop
- Controls - Push-Pull Cables Installation
- Crosstube Installation
- Decals
- Driver and Passenger Side Winch Air Controls - DP 50K 2 Speed Gear Shift
- Driver and Passenger Side Winch Air Controls - DP 50K Ramsey 50K 2 Speed Motor Shift
- Driver Side Hydraulic Pressure Gauges
- Hydraulic Tank Assembly
- Hydraulic Tank Installation
- Hydraulics - Lines and Fittings
- Hydraulics - Supply-Pressure-Return
- Passenger Side Winch Air Controls - 2 Speed Gear Shift
- Rear Spade Tubing
- Rear Tail Plate Installation
- Subframe Hydraulic Tubing
- Subframe Installation
- Tailboard D-Ring Installation
- Underlift Assembly - 3170000407 - 56,500 LB Optional
- Underlift Assembly - 3507100001 - 53,000 LB Standard
- Underlift Installation - 53,000 LB Standard
- Underlift Installation - 56,500 LB Optional
- Underlift Tools - 14,000 LB Tire Lift
- Underlift Tools - 25,000 LB Tire Lift
- Underlift Tools - Fifth Wheel Attachment
- Underlift Tools - Frame Forks
- Underlift Tools - Pintle Hook
- Winch Electric Speed Controls - DP 50K Ramsey 50K 2 Speed Motor Shift
- Winch Electric Speed Free Spool Controls - DP 50K Ramsey 50K 2 Speed - Gear Shift Winch
- Winch Electric Speed Free Spool Controls - DP 50K Ramsey 50K 2 Speed - Motor Shift Winches
- Winch Installation - 50K DP Planetary 2 Speed Gear Shift - Optional
- Winch Installation - 50K DP Planetary 2 Speed Motor Shift - Standard
- Winch Installation - 50K Ramsey Planetary 2 Speed - Optional
- Wrecker Boom Assembly - 2 Piece Boom
- Wrecker Boom Assembly - 3 Piece Boom