Underlift Assembly - 30,000 LB Optional
Need Help?
(800) 222-6047
Other Diagrams for this model:
- Boom Installation - 2 Piece Boom
- Boom Tube Assembly
- Controls - 12 Function Non-Proportional Miratron
- Controls - 12 Function Proportional Miratron
- Controls - 6 Function Non-Proportional Miratron
- Controls - Control Valve Assembly
- Controls - Control Valve Installation
- Controls - Electrical Emergency Stop
- Controls - Push-Pull Cables Installation
- Crosstube Installation
- Decals
- Driver and Passenger Side Winch Air Controls - DP 25K and 35K
- Driver Side Hydraulic Pressure Gauges
- Hydraulic Tank Assembly
- Hydraulic Tank Installation
- Hydraulics - Lines and Fittings
- Hydraulics - Supply-Pressure-Return
- Rear Spade Installation
- Rear Spade Tubing
- Rear Tail Plate Installation
- Subframe Hydraulic Tubing
- Subframe Installation - 110in Body
- Subframe Installation - 146in Body
- Underlift Assembly - 35,000 LB Standard
- Underlift Installation
- Underlift Tools - 14,000 LB Tire Lift
- Underlift Tools - 25,000 LB Tire Lift
- Underlift Tools - Fifth Wheel Attachment
- Underlift Tools - Frame Forks
- Underlift Tools - Pintle Hook
- Winch Electric Speed Free Spool Controls - DP 25K and 35K
- Winch Installation - 25K DP Planetary Winches
- Winch Installation - 35K DP Planetary Winches
- Wrecker Boom Assembly - 2 Piece Boom